Permits & Section 29A Consent in Glen Waverley

We prepare and lodge the demolition paperwork — including the Section 29A report and consent — and guide you through the extra planning permit needed where a Heritage Overlay applies to your address.

Approvals are what set the start date on a demolition. The physical work is fast and predictable; the paperwork in front of it is neither, and it is where most programs slip.

What is involved

A demolition permit issued through a registered building surveyor is the core requirement. Separately, Section 29A report and consent from council applies to many residential demolitions in Victoria. Council has to consider that application and respond, and because that response is not immediate it is very often the step that determines the overall timeline.

An asset protection permit is generally required where work affects council assets, meaning footpaths, kerbs, crossovers and nature strips. Given demolition involves heavy machinery and truck movements, that applies to most jobs.

Where a planning overlay applies to the property, a planning permit may be required as well, which is a longer process. Overlays are less widespread across Monash than in some neighbouring municipalities, but they do exist and should be checked rather than assumed absent.

Where people get caught out

The most common issue is starting the approvals process late, after a builder's start date has already been committed. Approvals do not compress to suit a program.

The second is not running service abolishment in parallel. Abolishment is separate from approvals, handled by the distributors and authorities, and each has its own lead time. Applying for those while approvals are in progress rather than afterwards is the single most effective way to shorten a program.

The third is assuming a property has no overlay controls without checking.

What we handle

We confirm what applies to your specific property, prepare and lodge the applications, respond to requests for further information, and track them to decision so you have realistic dates.

Our article on demolition permits in Victoria covers the framework, and our piece on how long demolition takes in Monash sets out where the time actually goes.

Why choose us for permits & section 29a consent

  • Section 29A report and consent applications prepared and lodged
  • Building permit pathway coordinated with your building surveyor
  • Applications submitted complete, avoiding delay from information requests
  • Heritage and streetscape constraints identified before you commit to a scope
  • Service abolishments flagged on day one so utility queues run in parallel
  • Honest program dates, including where an approval is likely to take longer
Need permits & section 29a consent in Glen Waverley?
FAQs

Permits & Section 29A Consent — common questions

What is Section 29A report and consent?

It is a consent required from council for many residential demolitions in Victoria, separate from the building permit. Council considers the application and responds, and since that response takes time, it is commonly the step that sets the overall project timeline.

How long do demolition approvals take in Monash?

It depends on what applies to the property. A straightforward permit and Section 29A consent is a shorter and more predictable path than anything requiring a planning permit. We give realistic timeframes once we have confirmed what your property triggers.

Do I need an asset protection permit?

In most cases yes. Demolition involves machinery and truck movements over or adjacent to council assets such as footpaths, kerbs and crossovers, and councils generally require a permit and a condition record before work affecting them begins.

Can I start service abolishment before approvals come through?

Yes, and you should. Abolishment is a separate process run by the distributors and authorities, each with its own lead time. Running it in parallel with approvals rather than sequentially is the most effective way to shorten the overall program.