Glen Waverley DemolitionHouse Demolition & Knockdown-Rebuild Site Preparation · Glen Waverley, VICCall +61 412 352 272
Licensed & Insured · Free Quotes

Glen Waverley's Knockdown & Demolition Specialists

Fixed-price house demolition across Glen Waverley and the City of Monash — permits and Section 29A consent handled, asbestos managed, your block left clear, level and ready to build.

Get your free quote
We reply fast during business hours.
No spam. We only call about your job.
Licensed & Insured
Free Quotes
Same-Day Available
Local Team
Proof, not promises

Before & after

Before — Full house demolition and site clearing, Glen WaverleyBefore
After — Full house demolition and site clearing, Glen WaverleyAfter
Full house demolition and site clearing, Glen Waverley
Before — Double-storey brick home removed, block cleared for rebuild in Wheelers HillBefore
After — Double-storey brick home removed, block cleared for rebuild in Wheelers HillAfter
Double-storey brick home removed, block cleared for rebuild in Wheelers Hill
Before — Concrete pool and garage removed, backfilled and compacted, Mount WaverleyBefore
After — Concrete pool and garage removed, backfilled and compacted, Mount WaverleyAfter
Concrete pool and garage removed, backfilled and compacted, Mount Waverley
About us

Your local Glen Waverley crew

Glen Waverley Demolition is a demolition and site-preparation specialist working across Glen Waverley and the wider City of Monash — Mount Waverley, Wheelers Hill, Mulgrave, Oakleigh, Clayton, Notting Hill and Chadstone. Monash is repeatedly named Melbourne's most active knockdown-rebuild corridor, and it shows in the work: wide post-war blocks and ageing cream and red brick homes where replacing the house makes more sense than another renovation, often to secure a spot in a sought-after school zone. We handle Section 29A consent and permit paperwork, arrange service disconnections, manage licensed asbestos removal, and hand your builder a clean, level, properly cleared block on the date they need it.

Get in touch
Glen Waverley Demolition team at work in Glen Waverley
Good to know

Questions, answered

How much does it cost to demolish a house in Glen Waverley?

Most standard three-bedroom demolitions in Melbourne fall between $15,000 and $35,000, with double-storey and full-brick homes pushing toward $40,000 and difficult sites reaching around $50,000. In Monash the variables that move the price are asbestos content, street and driveway access, how much concrete, paving and pool structure has to come out, and any heritage requirements. We quote fixed-price after a site inspection so there are no mid-job surprises.

Do I need a permit to demolish my house?

Yes. In Victoria a demolition needs a building permit, and before that you generally need council consent under Section 29A of the Building Act 1993. If your property sits in a Heritage Overlay you will also need a planning permit before demolition can be approved. We prepare and lodge this paperwork as part of the job and tell you upfront which approvals your specific address will need. Always confirm the position with the City of Monash.

How long does a demolition take?

The machine work on a typical house is usually one to two weeks including waste removal and site clean-up. The realistic end-to-end timeline from first inspection to a cleared block is closer to three to eight weeks, because approvals and service disconnections take longer than the demolition itself. We start the permit and disconnection process immediately so those lead times run in parallel rather than one after another.

What happens about asbestos?

We treat every pre-1990 home as likely to contain asbestos until proven otherwise — commonly in eaves, wet-area sheeting, fences and old vinyl backing. Where it is present, licensed removalists take it out before general demolition begins, and it goes to an EPA-approved facility with disposal documentation provided to you. Asbestos handling is priced transparently in the quote rather than appearing later as a variation.

Do you disconnect power, gas and water?

Yes — arranging service abolishments and disconnections is part of the job, and it is the step that most often delays a demolition when it is left late. Electricity, gas, water and sometimes telecommunications each have their own provider lead times. We lodge these early, track them, and schedule the machines only once every service is confirmed disconnected and the site is safe to work.

Ready when you are.

Free quotes · Upfront pricing · Satisfaction guaranteed
Call +61 412 352 272
Tap to call +61 412 352 272